1. VIEW OF EAST WALL IN SOUTH LOBBY SHOWING MURAL AND CIRCUIT COURTROOM ENTRANCE.
HABS ORE,29-TILA,1-1
HABS ORE,29-TILA,1-11 HABS ORE,29-TILA,1-8 RWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038666pt.gif x 1 038666pr.jpg|038666pv.jpg|038666pu.tif ʐ 2. VIEW OF WEST WALL SHOWING MAIN ENTRANCE INTO SOUTH LOBBY AND ALUMINUM VESTIBULE ADDED IN RECENT YEARS. ELEVATOR WILL BE CONSTRUCTED TO THE RIGHT OF THE DOORWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038667pt.gif x 2 038667pr.jpg|038667pv.jpg|038667pu.tif ʐ 3. VIEW OF THE NORTHWEST CORNER OF SOUTH LOBBY SHOT FROM THE SOUTHEAST CORNER.
HABS ORE,29-TILA,1-3 S. ELEVATOR WILL BE CONSTRUCTED TO THE RIGHT OF THE DOORWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038668pt.gif x 3 038668pr.jpg|038668pv.jpg|038668pu.tif ʐ 4. VIEW OF THE NORTHWEST CORNER OF SOUTH LOBBY SHOT FROM THE NORTHEAST CORNER.
HABS ORE,29-TILA,1-4 S. ELEVATOR WILL BE CONSTRUCTED TO THE RIGHT OF THE DOORWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038669pt.gif x4 038669pr.jpg|038669pv.jpg|038669pu.tif ʐ 5. VIEW OF THE NORTHWEST CORNER OF SOUTH LOBBY SHOWING THE AREA TO BE OCCUPIED BY THE HOISTWAY.
HABS ORE,29-TILA,1-5 BE CONSTRUCTED TO THE RIGHT OF THE DOORWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038670pt.gif w5 038670pr.jpg|038670pv.jpg|038670pu.tif ʐ 6. VIEW OF THE NORTH WALL OF THE SOUTH LOBBY SHOWING THE DOORWAY INTO THE MAIN CORRIDOR.
HABS ORE,29-TILA,1-6 LA,1-5 BE CONSTRUCTED TO THE RIGHT OF THE DOORWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038671pt.gif x 6 038671pr.jpg|038671pv.jpg|038671pu.tif ʐ 7. VIEW OF THE NORTHEAST CORNER OF THE SOUTH LOBBY.
HABS ORE,29-TILA,1-7 IN CORRIDOR.
HABS ORE,29-TILA,1-6 LA,1-5 BE CONSTRUCTED TO THE RIGHT OF THE DOORWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038672pt.gif y7 038672pr.jpg|038672pv.jpg|038672pu.tif ʐ 8. VIEW OF THE WEST WALL IN THE NORTHWEST CORNER OF SOUTH LOBBY SHOWING THE TWO VENTILATORS TO BE DISPLACED BY THE ELEVATOR HOISTWAY.
HABS ORE,29-TILA,1-8 RWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038673pt.gif x8 038673pr.jpg|038673pv.jpg|038673pu.tif ʐ 9. VIEW OF THE UPPER VENTILATOR TO BE DISPLACED.
HABS ORE,29-TILA,1-9 HE TWO VENTILATORS TO BE DISPLACED BY THE ELEVATOR HOISTWAY.
HABS ORE,29-TILA,1-8 RWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038674pt.gif x 9 038674pr.jpg|038674pv.jpg|038674pu.tif ʐ 10. VIEW OF THE LIMESTONE WAINSCOT AND MOULDING IN THE NORTHWEST CORNER OF THE SOUTH LOBBY.
HABS ORE,29-TILA,1-10 EVATOR HOISTWAY.
HABS ORE,29-TILA,1-8 RWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038675pt.gif x 10 038675pr.jpg|038675pv.jpg|038675pu.tif ʐ 11. VIEW OF THE FOSSILIFEROUS (OOLITIC) LIMESTONE WAINSCOT IN THE NORTHWEST CORNER OF THE SOUTH LOBBY.
HABS ORE,29-TILA,1-11 HABS ORE,29-TILA,1-8 RWAY IN THE NORTHWEST CORNER OF THE LOBBY.
HABS ORE,29-TILA,1-2 or/or0300/or0325/photos 038676pt.gif x 11 038676pr.jpg|038676pv.jpg|038676pu.tif ʐ